Breather-Foil Installation

Between Rafter

between-rafter

Over Rafter

over-rafter

Sarking Board

sarking-board

How does Breather-Foil Work?

how-does-breatherfoil-work

Detailing

In roofs covered with rigid insulation or sarking boards, Breather Foil-FR Roofing Membrane is laid in the normal manner, prior to the counter battens and the tiling battens being applied.

The Code of Practice for slating and tiling, BS 5534; Part 1 : 1978 (1985). Installation can be carried out under all conditions normal to roofing work.

Corrosion resistant staples or galvanised clout nails must be used at 200mm centres.

Ridge

ridge

Eaves

eaves-detailing