Installation Process

  1. Processed as per your typical construction detail i.e. Liner Panels/Spacer System etc.
  2. Lay Glass Fibre/Mineral Wool over Liner Panels supported by self adhesive Stick Pins
  3. Lay Foil-Clad FR directly over the top of the quilt and Stick Pins, ensuring that the first roll lays over drip flashing at bottom
  4. Ensure that at every spacer system centre the top edge of the Foil-Clad FR is fitted flush to the underside of the spacer system and, at the bottom edge, overlaps the lower spacer by 75mm minimum
  5. Vertical laps must be no less than 50mm and taped with YBS Foil-Clad Tape
  6. Horizontal laps should be a minimum 75mm and NOT taped
  7. Foil-Clad FR can easily be cut with a sharp knife.
 
 
Suits all Typical Construction
Methods
Major Cost Savings
Simple to Install Minimises Cold Bridging
FIRE RETARDANT UInsulates and Vents/Breathes
in One Application
Waterproof - Protects Quilt from
Rain During Construction
Independently Tested for
Breathability
Complies with the New Part L
Regulations and Part J Standards
CFC & HCFC FREE
 

Foil Clad FR is a derivative of Breather foil FR which is fully certified.