Installation in suspended floor applications
- Foil-Tec Single is rolled
out with the shiny side facing
upwards, over the joists
- Foil-Tec Single is then nailed
in place through the Foil-Tec
Saddle Clips to maintain
required air gap - 4–per m²
- The horizontal joints are overlapped by 100mm and are left
open to allow any moisture accumulation to dissipate
- Foil-Tec
Single must be brought up (behind the skirting board) to 75mm
- The
decking is then fixed with screws (at 200mm centres) 37mm into
the joists
Joist End Fitting Recommendations
Make 2 x 75-100mm cuts in Foil-tec - same width as joist. Then make one further cut, same width again, on each side. Fold up flap(A), fold back flaps (B) and pull Foil-tec (C) up to meet wall. Fix to wall and fit skirting board over, concealing Foil-tec.

Installation for concrete floor applications
- Foil-Tec Single is
rolled out onto
concrete floor with
shiny side facing
upwards - leaving
enough edge overlap
for 75mm lip to be left
behind skirting
- Timber battens/joists (min 50mm x 50mm)
are then laid on top of
the Foil-Tec Single, spaced at centres to suit the
particular flooring.
- The decking is then fixed with screws (at 200mm centres) into
battens/joists providing
25mm penetration into the 50mm wide battens/joists
|