Installation in suspended
floor applications
- Foil-Tec Single is
rolled out with the shiny side facing upwards, over the
joists
- Foil-Tec Single is
then nailed in place through the Foil-Tec
Saddle Clips to maintain required air gap - 4-
per m²
- The horizontal joints are overlapped by 100mm and are
left open to allow any moisture accumulation to dissipate
- Foil-Tec Single must
be brought up (behind the skirting board) to 75mm
- The decking is then fixed with screws (at 200mm centres)
37mm into the joists
Joist End Fitting
Recommendations
Make 2 x 75-100mm cuts in Foil-tec - same width as joist. Then make one further
cut, same width again, on each side. Fold up flap(A), fold back flaps (B) and
pull Foil-tec (C) up to meet wall. Fix to
wall and fit skirting board over, concealing Foil-tec.

Installation for concrete floor applications
- Foil-Tec Single is
rolled out onto concrete floor with shiny side facing
upwards - leaving enough edge overlap for 75mm lip to
be left behind skirting
- Timber battens/joists (min 50mm x 50mm) are then laid
on top of the Foil-Tec Single,
spaced at centres to suit the particular flooring.
- The decking is then fixed with screws (at 200mm centres)
into battens/joists providing 25mm penetration into the
50mm wide battens/joists
|