Polyethylene Insulation DPC


Horizontal Installation
  • Therma-bridge Plus should be positioned at the cill/threshold reveal and held in place by the returned (closure blockwork).
  • Alternatively, Therma-bridge Plus can be tacked onto the side of the window frame, if the window is to be built-in.
  • Therma-bridge Plus should be positioned with the dpc facing outwards.
Vertical Installation
  • 100mm of the insulation should be cut/ trowelled off the dpc prior to the commencement of the installation.
  • The exposed dpc should be lapped onto the horizontal dpc, the insulation cut edge being butted as tight as possible onto the top edge of the horizontally applied Thermabridge Plus.
  • Therma-bridge Plus should be built-in as the work progresses.
  • Alternatively, Therma-bridge Plus can be tacked onto the side of the window frame, if the window is to be built-in.
  • Therma-bridge Plus should be positioned with the dpc facing outwards.

 

 

Overview
Installation
Technical
Calculations
Data Sheet
 

Elimiates Cold Bridging
Fully Certified
1,000,000 + m/Linear Supplied

CFC/HCFC Free
Rigid Lengths Ease Installation
Meets NHBC and Robust Standards