1. Inner blockwork to
be built first. (NOTE: Therma-Flect
Wall Board
must extend below the level of the internal flooring insulation).
2. Build a minimum of four
courses of internal blockwork with the first course brick ties
set at DPC level.
3. Offer up the Therma-Flect
Wall Board board to the inner leaf with the foil faced
membrane facing outwards into the cavity, ensuring that the 50mm
of overlaps face downwards and to the right to form a waterproof
skin.
4. Secure Therma-Flect
Wall Boar with YBS Retaining
Clips at the top and bottom edges. Cut vertical slits
in the membrane at the point where the horizontal overlaps meet
wall ties - this will allow the foil membrane to stay flat.
5. Build outer leaf. After
raising each wall section, loose mortar should be cleaned off theinsulation
board. Never allow loose mortar into the cavity, or slip behind
the Therma-Flect Wall Board
6. Build next course and fix Therma-Flect
Wall Board as above. Ensure Therma-Flect
Wall Board is installed with vertical joints staggered.
|